Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
In this Florida Today editorial, geologist Randall Parkinson speaks against new Indian River Lagoon inlets. (1) ·
Seatrout closure Nov 1 for Florida's East Coast. (1) ·
Tiny single-celled algae have begun to cast a huge pea-soup green shadow over the Indian River Lagoon, setting the stage for a repeat of the massive fish kill four years ago, when dead sea life fouled canals and choked the lagoon during a smelly summer of environmental chaos. (1)
Showing below up to 4 results in range #1 to #4.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)