Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
A new inlet will not save the lagoon (1) ·
Bloom Free But Barren (1) ·
Indian River Lagoon 2020 Water Quality Update (1) ·
Indian River lagoon is pea-soup green, raising fears of another 'bloom of doom' (1) ·
Ron DeSantis-backed bill to increase sewage spill fines passes first committee (1) ·
SR405 NASA Causeway to be replaced by 2025 (1)
A bill backing a Gov. Ron DeSantis proposal to raise fines for violating environmental protections passed its first committee stop Monday. (1) ·
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
In this Florida Today editorial, geologist Randall Parkinson speaks against new Indian River Lagoon inlets. (1) ·
IRL Water Quality Update by Dr. Chuck Jacoby, SJRWMD (1) ·
Tiny single-celled algae have begun to cast a huge pea-soup green shadow over the Indian River Lagoon, setting the stage for a repeat of the massive fish kill four years ago, when dead sea life fouled canals and choked the lagoon during a smelly summer of environmental chaos. (1) ·
Without immediate drastic environmental changes from the city to federal level Brevard County residents may soon witness the death of the Northern Indian and Banana River lagoons. (1)
Showing below up to 6 results in range #1 to #6.