Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
In this Florida Today editorial, geologist Randall Parkinson speaks against new Indian River Lagoon inlets. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1) ·
Tiny single-celled algae have begun to cast a huge pea-soup green shadow over the Indian River Lagoon, setting the stage for a repeat of the massive fish kill four years ago, when dead sea life fouled canals and choked the lagoon during a smelly summer of environmental chaos. (1)
Showing below up to 4 results in range #1 to #4.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)