Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
As the new bridge to Florida’s future spaceport, the new 4,025-foot-long span across the Indian River lagoon will be Kennedy Space Center's key corridor for commercial spaceflight. (1) ·
Dr. Chuck Jacoby, Chief Environmental Scientist, St. Johns River Water Management District, presented an Indian River Lagoon Water Quality Update to the Department of Environmental Protection IRL Basin Management Action Plan meeting on December 16, 2020. (1) ·
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
NASA passes ownership of the SR405 Indian River Causeway to the Florida Department of Transportation along with a decades old categorical exclusion that exempts the bridge replacement from environmental review. (1) ·
On March 2nd, 2022, the Brevard Nature Alliance Board of Directors voted to discontinue the Space Coast Wildlife Festival and dissolve the non-profit corporation effective April 30, 2022. (1)
Showing below up to 5 results in range #1 to #5.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)