Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
$53M in funding has been designated for FDEP wastewater and sewer to septic conversion projects along the Indian River Lagoon. (1) ·
As the new bridge to Florida’s future spaceport, the new 4,025-foot-long span across the Indian River lagoon will be Kennedy Space Center's key corridor for commercial spaceflight. (1) ·
NASA passes ownership of the SR405 Indian River Causeway to the Florida Department of Transportation along with a decades old categorical exclusion that exempts the bridge replacement from environmental review. (1) ·
On March 2nd, 2022, the Brevard Nature Alliance Board of Directors voted to discontinue the Space Coast Wildlife Festival and dissolve the non-profit corporation effective April 30, 2022. (1)
Showing below up to 4 results in range #1 to #4.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)