Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
$53M in funding has been designated for FDEP wastewater and sewer to septic conversion projects along the Indian River Lagoon. (1) ·
Indian River County has received a $650,000 grant from the Florida DEP for construction of an Aquatic Plant System to remove nutrients from farm waters before discharge into the Indian River Lagoon. (1) ·
Sebastian Inlet Tax District (SITD) has posted a public notice announcing the closure of the North and South Jetties October 18 - 22, 2021 while engineers conduct an inspection of the structures. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1)
Showing below up to 4 results in range #1 to #4.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)