Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Brevard Coalition presents "Lagoon Straight Talk" on January 22, 2020 at Satellite High School. (1) ·
Sebastian Inlet Tax District (SITD) has posted a public notice announcing the closure of the North and South Jetties October 18 - 22, 2021 while engineers conduct an inspection of the structures. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1) ·
Tiny single-celled algae have begun to cast a huge pea-soup green shadow over the Indian River Lagoon, setting the stage for a repeat of the massive fish kill four years ago, when dead sea life fouled canals and choked the lagoon during a smelly summer of environmental chaos. (1)
Showing below up to 4 results in range #1 to #4.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)