Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
Florida Governor Ron DeSantis has appointed three additional members to the St. Johns River Water Management District Governing Board. (1) ·
Indian River Lagoon manatees are starving to death at an alarming rate due to the depletion of seagrass, and the interruption of their natural migration. (1) ·
NASA passes ownership of the SR405 Indian River Causeway to the Florida Department of Transportation along with a decades old categorical exclusion that exempts the bridge replacement from environmental review. (1) ·
NOAA declares Unusual Mortality Event as 11% of Florida's east coast manatee population expires in the Indian River Lagoon National Estuary. (1)
Showing below up to 5 results in range #1 to #5.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)