Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'66th Avenue ' (1) ·
'CR-609 (82nd Ave.)' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'E Gateway Blvd ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Enterprise Rd. ' (1) ·
'Indiantown Rd. ' (1) ·
'LINTON BLVD ' (1) ·
'Roebuck Road ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-98 (SR-80) ' (1) ·
'WB US 98 SR 80 ' (1)
790191 (1) ·
884098 (1) ·
884099 (1) ·
894041 (1) ·
930006 (1) ·
930374 (1) ·
930402 (1) ·
930433 (1) ·
930462 (1) ·
930539 (1) ·
931013 (1) ·
934283 (1) ·
934485 (1)
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.7Mi South of SR-60 ' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.9 Mi South of SR-60 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'No. City Line Boca Raton ' (1) ·
'Palm Beach Garden Interch' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'Tpk. / SR 706 Interchange' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)