Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'Canal ' (1) ·
'CANAL L-30 ' (1) ·
'Deep Creek ' (1) ·
'DRAINAGE CANAL ' (1) ·
'Elbow Creek ' (1) ·
'Hanson Grant Outlet ' (1) ·
'Little Haw Creek ' (1) ·
'MAIN CANAL ' (1) ·
'Middle Haw Creek ' (1) ·
'Sawgrass Creek ' (1) ·
'St Johns River Relief ' (1) ·
Canal (1) ·
Sawgrass Creek (1) ·
St Johns River (1) ·
St Johns River Relief (1) ·
St. Johns River (1)
700007 (1) ·
700018 (1) ·
700023 (1) ·
700180 (1) ·
700212 (1) ·
700213 (1) ·
700214 (1) ·
700215 (1) ·
790016 (1) ·
790017 (1) ·
790018 (1) ·
790019 (1) ·
790920 (1) ·
885810 (1) ·
890090 (1) ·
890106 (1) ·
890139 (1) ·
930444 (1) ·
934419 (1)
'0.4Mi. North of SR-60 ' (1) ·
'0.6 Mi W of SR-11 ' (1) ·
'0.85 mile South of Linton' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'3.2 Mi W of SR-11 ' (1) ·
'5.8 Miles West of SR-76 ' (1) ·
'8.9 miles west of SR-76 ' (1) ·
'I-95 (2 mi. N. of SR-76) ' (1) ·
'SR-40 - Little Haw Creek ' (1) ·
'SR-40 - Middle Haw Creek ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'US-192EB - Sawgrass Creek' (1) ·
I-95 SB Fiske Blvd Ramp (1) ·
US-192 EB-St Johns Relief (1) ·
US-192 EB-St Johns River (1) ·
US-192 WB - Sawgrass Cr. (1) ·
US-192 WB- St Johns River (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)