Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'CSX-RR ' (1) ·
'Drainage Canal ' (1) ·
'E 3.5 AIRPORT CANAL ' (1) ·
'LWDD E-1 Canal ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'Rio Mar Bay ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'SW FORK LOXAHATCHEE RVR ' (1) ·
'Ten Mile Creek ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
790176 (1) ·
885812 (1) ·
890141 (1) ·
890142 (1) ·
894060 (1) ·
930392 (1) ·
930413 (1) ·
931004 (1) ·
934229 (1) ·
934522 (1) ·
940120 (1) ·
940121 (1) ·
940136 (1)
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.3MI N of SR-706 ' (1) ·
'0.4 MILE EAST OF SR-809 ' (1) ·
'1.5mi East of Indiantown' (1) ·
'100Ft. South of Bay Drive' (1) ·
'1mi. West of CR-613 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'AT US-27 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-44 over CSX-RR ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)