Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'BESSEY CREEK ' (1) ·
'C-24 CANAL ' (1) ·
'Drainage Ditch ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'FEC RR(Olympia Overpass)' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'NORTH CANAL ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'PHIPP CANAL ' (1) ·
'RANGE LINE CANAL ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (STUART INT) ' (1)
'CARLTON RD (CR613)' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'CR-717 ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'G BUSH BLVD(NE8TH)' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'NB SR-5 (US-1) ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'SB SR-5 (US-1) ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-3 ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'Willowood Drive ' (1)
700072 (1) ·
700201 (1) ·
704032 (1) ·
704203 (1) ·
884028 (1) ·
884058 (1) ·
884060 (1) ·
885601 (1) ·
890001 (1) ·
890021 (1) ·
890068 (1) ·
890082 (1) ·
890085 (1) ·
890107 (1) ·
930026 (1) ·
930072 (1) ·
930235 (1) ·
930334 (1) ·
940019 (1) ·
940035 (1) ·
940049 (1) ·
940050 (1)
'.21 E of Minton Rd. ' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'1MI W of US-1 ' (1) ·
'2.1MI S of SR-70 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'At Lake Washington Rd ' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'STUART TPK INTERCHANGE ' (1)
26282666 (1) ·
26371314 (1) ·
26421986 (1) ·
26450626 (1) ·
27023798 (1) ·
27023948 (1) ·
27033219 (1) ·
27035280 (1) ·
27092801 (1) ·
27102733 (1) ·
27154481 (1) ·
27201783 (1) ·
27222772 (1) ·
27222822 (1) ·
27392294 (1) ·
27392357 (1) ·
27431016 (1) ·
27453074 (1) ·
28030000 (1) ·
28085200 (1) ·
28242777 (1) ·
28242782 (1)
80034367 (1) ·
80070222 (1) ·
80070240 (1) ·
80072029 (1) ·
80080366 (1) ·
80101893 (1) ·
80142789 (1) ·
80180781 (1) ·
80184796 (1) ·
80203293 (1) ·
80210855 (1) ·
80230229 (1) ·
80230306 (1) ·
80230357 (1) ·
80284193 (1) ·
80290638 (1) ·
80324598 (1) ·
80400400 (1) ·
80422088 (1) ·
80422154 (1) ·
80424100 (1) ·
80424695 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.