Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C. Stanley Weaver Canal ' (1) ·
'CANAL E-4 ' (1) ·
'I-4 ' (1) ·
'ICWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-30 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'WARNER CREEK ' (1)
'20TH AVENUE ' (1) ·
'CLINT MOORE RD EB ' (1) ·
'CONGRESS AVE NB ' (1) ·
'DIXIE HIGHWAY ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'JOG ROAD SB ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'SR AIA ' (1) ·
'SR-472 WB ' (1)
790190 (1) ·
884062 (1) ·
890113 (1) ·
934160 (1) ·
934161 (1) ·
934224 (1) ·
934907 (1) ·
934909 (1) ·
934915 (1) ·
934918 (1) ·
934930 (1) ·
934933 (1) ·
934935 (1) ·
934937 (1) ·
934969 (1) ·
935308 (1) ·
940094 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'1.2Mi. E of Savannah Rd. ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'South Causeway over ICWW ' (1) ·
'SR-472 WB over I-4 ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)