Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'C-51 CANAL ' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'E-1 Canal ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-2-E Canal ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'I-95 ' (1) ·
'Jupiter Creek ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'South Relief Canal ' (1) ·
'SR-46 ' (1) ·
'Turkey Creek ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
Banana River Relief (1) ·
Horse Creek (1)
'CR-516 ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'I-95 ' (1) ·
'Indiantown Road ' (1) ·
'JOG ROAD ' (1) ·
'Lake Worth Road ' (1) ·
'PALMETTO PK RD ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-808 Glades Road' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) ' (1) ·
SR-520 (1) ·
US-1 (1)
700188 (1) ·
700192 (1) ·
700203 (1) ·
700206 (1) ·
700230 (1) ·
880089 (1) ·
880100 (1) ·
880101 (1) ·
880105 (1) ·
930265 (1) ·
930401 (1) ·
930413 (1) ·
930414 (1) ·
930415 (1) ·
930420 (1) ·
930456 (1) ·
931004 (1) ·
934213 (1) ·
934297 (1) ·
934902 (1)
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'CR-516 over I-95 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'I-95 over SR-46 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 over Turkey Creek ' (1) ·
SR-520 - Banana River (1) ·
US-1 over Horse Creek (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)