Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'C-37 Canal ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'CYPRESS CREEK ' (1) ·
'DIRT FARM ROAD ' (1) ·
'E-4 CANAL ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'M-1 CANAL ' (1) ·
'MOORES CREEK ' (1) ·
'SR-9 (I-95) ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1)
'Americana Blvd. ' (1) ·
'CENTRE PK. DR. N. ' (1) ·
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'Haverhill Rd ' (1) ·
'INDIAN STREET ' (1) ·
'LINTON BLVD. ' (1) ·
'MINER RD. ' (1) ·
'NORTH 2ND STREET ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'PROSPERITY FARM RD' (1) ·
'S. VERDE TRAIL ' (1) ·
'St Lucie West Blvd' (1) ·
'SW 18TH STREET WB ' (1)
705918 (1) ·
894040 (1) ·
934128 (1) ·
934129 (1) ·
934137 (1) ·
934155 (1) ·
934156 (1) ·
934222 (1) ·
934359 (1) ·
934483 (1) ·
934901 (1) ·
934903 (1) ·
934942 (1) ·
937706 (1) ·
937716 (1) ·
940133 (1) ·
945000 (1)
'.25 Mi E of AUSTRALIAN ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.2MI W OF ROYAL P.B. BLV' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1MI W OF US-1 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'At S Military Trail ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)