Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930267 (1) ·
930268 (1) ·
930460 (1) ·
934138 (1) ·
934318 (1) ·
934915 (1) ·
934916 (1) ·
934936 (1) ·
934937 (1) ·
940069 (1)
'0.7 mi south of PGA Blvd.' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'5.2MI S of CR-712 ' (1) ·
'SR-80 & Military Trail ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)