Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Inlet ' (1) ·
'CANAL ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'Hypoluxo Rd. ' (1) ·
'Hypoluxo Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAKE OSBOURNE ' (1) ·
'Lantana Road ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'N Fork Loxahatchee River' (1)
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'Hypoluxo Rd ' (1) ·
'Hypoluxo to SB I95' (1) ·
'INLET CAY DR. ' (1) ·
'Island Drive ' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'Lantana to I 95 SB' (1) ·
'SABLE ISLAND DRIVE' (1) ·
'SB I 95 to Lantana' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR A1A ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'TEQUESTA DRIVE ' (1)
930056 (1) ·
930061 (1) ·
930274 (1) ·
930275 (1) ·
930276 (1) ·
930298 (1) ·
930299 (1) ·
930307 (1) ·
931002 (1) ·
931003 (1) ·
934331 (1) ·
934332 (1) ·
934341 (1) ·
934342 (1) ·
934347 (1) ·
934369 (1) ·
936654 (1) ·
936655 (1) ·
936656 (1) ·
936776 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.04Mi W OF A1A ' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)