Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Blue Lake Equalizer ' (1) ·
'Cnl.Trib. to Turnbull Ck' (1) ·
'Cow Creek ' (1) ·
'E-1 CANAL ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Little Cow Creek ' (1) ·
'Little Haw Creek ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'N CANAL ' (1) ·
'Nav. Banana River Canal ' (1) ·
'PERENNIAL CANAL ' (1) ·
'Rowland Canal ' (1) ·
'Samsula Canal ' (1) ·
'Sykes Creek ' (1) ·
'Tomoka River ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'Turnbull Creek ' (1) ·
'WILLOUGHBY CREEK ' (1)
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'Cow Creek Road ' (1) ·
'E. CAMINO REAL ' (1) ·
'E. Minnesota Ave. ' (1) ·
'Girard Blvd. ' (1) ·
'Hunting Camp Road ' (1) ·
'LPGA Blvd ' (1) ·
'MAPP RD ' (1) ·
'Marsh Road ' (1) ·
'Maytown Road ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'PARK COMMERCE BLVD' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'Richland Ave ' (1) ·
'Samsula Drive ' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'Turnbull Bay Road ' (1) ·
'VANDEGRIFT-WILL RD' (1) ·
'West Farms Road ' (1) ·
'Williams Road ' (1)
704013 (1) ·
704016 (1) ·
794014 (1) ·
794022 (1) ·
794032 (1) ·
794038 (1) ·
794061 (1) ·
794063 (1) ·
794067 (1) ·
794130 (1) ·
794184 (1) ·
794185 (1) ·
890102 (1) ·
894033 (1) ·
894056 (1) ·
934408 (1) ·
934506 (1) ·
934920 (1) ·
934921 (1) ·
934922 (1) ·
934923 (1) ·
934940 (1) ·
936500 (1)
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.9 mile North of CR-40A ' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.1 miles North of US-92 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'1MILE E OF HATTON HWY ' (1) ·
'8.3 miles East of SR-415 ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1)
26202200 (1) ·
26211596 (1) ·
26211635 (1) ·
26212592 (1) ·
26212629 (1) ·
26295449 (1) ·
26442375 (1) ·
26535784 (1) ·
27011700 (1) ·
27080035 (1) ·
27101012 (1) ·
28220892 (1) ·
28233806 (1) ·
28502280 (1) ·
28563029 (1) ·
28592979 (1) ·
28594816 (1) ·
29020919 (1) ·
29021899 (1) ·
29024857 (1) ·
29030413 (1) ·
29043231 (1) ·
29130195 (1)
80043770 (1) ·
80075212 (1) ·
80121056 (1) ·
80121064 (1) ·
80121067 (1) ·
80121176 (1) ·
80161820 (1) ·
80162888 (1) ·
80285590 (1) ·
80321756 (1) ·
80401219 (1) ·
80413508 (1) ·
80563010 (1) ·
80573537 (1) ·
80574874 (1) ·
80575726 (1) ·
81012877 (1) ·
81022736 (1) ·
81025853 (1) ·
81063403 (1) ·
81160318 (1) ·
81162375 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)