Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'C.S.X. R/R ' (1) ·
'Canal ' (1) ·
'CANAL C-24 ' (1) ·
'CANAL-17 ' (1) ·
'CSX Railroad ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'OUTFALL CANAL ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SFWMD L-13 CANAL ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'TEN MILE CREEK ' (1)
'COUNTY LINE RD ' (1) ·
'CR-700 ' (1) ·
'CR611B(SELVITZ RD)' (1) ·
'JOG ROAD ' (1) ·
'Malabar Rd ' (1) ·
'Old Dixie Highway ' (1) ·
'OLD DIXIE HWY ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SAVONA BLVD. ' (1) ·
'SR-76 ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 NB TPK 175.4 ' (1) ·
'SR91 NB TPK 189.1 ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'SR91 SB TPK 175.4 ' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'Woolbright Road ' (1)
704004 (1) ·
705953 (1) ·
880057 (1) ·
880060 (1) ·
880065 (1) ·
880068 (1) ·
890079 (1) ·
890127 (1) ·
894021 (1) ·
930085 (1) ·
930142 (1) ·
930241 (1) ·
930300 (1) ·
930303 (1) ·
930359 (1) ·
934116 (1) ·
934273 (1) ·
934911 (1) ·
940015 (1) ·
945256 (1)
'.25 mi East of I-95 ' (1) ·
'0.1 mi E of Minton Rd ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.2MI S OF EDWARDS RD ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'1.8 MI N OF ST LUCIE CNTY' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'INT. OF CR-700 & CR-880 ' (1) ·
'Just West of I 95 ' (1) ·
'W of I 95 on Woolbright ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)