Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'CANAL L-30 ' (1) ·
'CPB20 CANAL ' (1) ·
'CR-3 ' (1) ·
'CSX Railroad ' (1) ·
'EL RIO CANAL ' (1) ·
'George King Blvd ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Ida Canal E-4 ' (1) ·
'Lateral Canal 30 ' (1) ·
'M-1 CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SR-524 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
George King Blvd (1)
'EL CLAIR RANCH RD.' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NW 7TH STREET ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'Peninsula Corp Dr ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR 710 ' (1) ·
'SR A1A ' (1) ·
'SR-404 EB ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'St. Johns Heritage' (1) ·
'US-1 (SR-5) ' (1) ·
SR-A1A SB (1)
700054 (1) ·
700128 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
704190 (1) ·
880085 (1) ·
890126 (1) ·
930269 (1) ·
930443 (1) ·
930455 (1) ·
930490 (1) ·
930534 (1) ·
934220 (1) ·
934222 (1) ·
934419 (1) ·
935221 (1) ·
937360 (1)
'.25mi W OF I-95 ' (1) ·
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'2.7 miles N of SR 806 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
11971 (1) ·
1350 (1) ·
25158 (1) ·
26546 (1) ·
27413 (1) ·
339472 (1) ·
34526 (1) ·
352347 (1) ·
36435 (1) ·
37302 (1) ·
39905 (1) ·
51182 (1) ·
511825 (1) ·
7000 (1) ·
73250 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)