Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CAMINO GARDENS WB ' (1) ·
'EB North Lake Blvd' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'Maytown Road ' (1) ·
'MURPHY RD ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'PALMETTO PK RD EB ' (1) ·
'PALMETTO PK RD WB ' (1) ·
'Pioneer Trail ' (1) ·
'SAVONA BLVD. ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR510 Wabasso Road' (1) ·
'WESTMORELAND BLVD ' (1)
794118 (1) ·
794141 (1) ·
880052 (1) ·
890115 (1) ·
890116 (1) ·
894003 (1) ·
930050 (1) ·
930373 (1) ·
934464 (1) ·
934465 (1) ·
935210 (1) ·
935307 (1) ·
935308 (1) ·
945250 (1) ·
945259 (1)
'.75 miles South of SR-882' (1) ·
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.4MI S OF PAAR DRIVE ' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'1mi. W of US-1. ' (1) ·
'2.5 miles North of SR-706' (1) ·
'4.8 miles East of SR-415 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)