Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal ' (1) ·
'FL TPK (SR-91) ' (1) ·
'FL TPK SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'Lateral A Canal ' (1) ·
'Lateral B Canal ' (1) ·
'Lateral C Canal ' (1) ·
'Lateral H Canal ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Okeechobee Waterway ' (1) ·
'Spruce Creek ' (1) ·
'Ten Mile Creek ' (1) ·
'Turnpike (SR-91) ' (1)
'16th St/College Ln' (1) ·
'45th Street CR-702' (1) ·
'53rd Street ' (1) ·
'Apollo Boulevard ' (1) ·
'Benoist Farms Rd ' (1) ·
'Congress Avenue ' (1) ·
'CR-4009 ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-714 Indian St. ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 NB ' (1) ·
'Island Way ' (1) ·
'Lyons Rd ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Roebuck Road ' (1) ·
'Spanish River Blvd' (1) ·
'SR91 N/S TPK 117.5' (1)
705604 (1) ·
794193 (1) ·
884071 (1) ·
884076 (1) ·
884083 (1) ·
884084 (1) ·
894062 (1) ·
930241 (1) ·
930488 (1) ·
930528 (1) ·
934166 (1) ·
934177 (1) ·
934283 (1) ·
934367 (1) ·
934711 (1) ·
934954 (1) ·
935222 (1) ·
935223 (1) ·
944016 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.14MI N of Indiantown Rd' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.25 mi N of Belvedere Rd' (1) ·
'0.3Mi E of Military Trail' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.0 Mi West of Haverhill ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'At CR-611 - 43rd Ave ' (1) ·
'At CR-613 ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR704 and 12th St' (1) ·
'Inter 66th Ave/College Ln' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)