Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'C-15 Canal ' (1) ·
'C-37 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'Indian River EastRelief ' (1) ·
'Lake Worth Relief ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD E3 Canal ' (1) ·
'LWDD L30 Canal ' (1) ·
'M-1 CANAL ' (1) ·
'SR 811 & FEC RR ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Tillman Canal ' (1) ·
Sebastian River (1)
'Blue Heron Blvd ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'EB SR 786 ' (1) ·
'Gateway Blvd. ' (1) ·
'Hagen Ranch Road ' (1) ·
'Jupiter Boulevard ' (1) ·
'Lantana Road ' (1) ·
'LYONS ROAD ' (1) ·
'Minton Road CR-509' (1) ·
'Quantum Blvd. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-520 ' (1) ·
'US-192 ' (1) ·
'WB US 98 SR 80 ' (1) ·
'Woolbright Road ' (1) ·
US-1 (1)
700208 (1) ·
700224 (1) ·
700235 (1) ·
704075 (1) ·
705923 (1) ·
930184 (1) ·
930461 (1) ·
930491 (1) ·
930545 (1) ·
934363 (1) ·
934365 (1) ·
934366 (1) ·
934731 (1) ·
934958 (1) ·
934989 (1) ·
936375 (1) ·
937367 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.5 MI. W of Military Tr ' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'1st overpass east of I-95' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-520 - Banana River ' (1) ·
'SR-A1A East of ICWW ' (1) ·
'US-192 - Indian River Rel' (1) ·
US-1 over Sebastian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)