Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Atlantic Avenue ' (1) ·
'CR-707 (BEACH RD) ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'EB PGA Blvd. ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'MAPP ROAD ' (1) ·
'NW 2ND ST ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR A1A ' (1) ·
'SR-80 ' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'WOOLBRIGHT ROAD ' (1)
890066 (1) ·
894059 (1) ·
930029 (1) ·
930056 (1) ·
930061 (1) ·
930064 (1) ·
930106 (1) ·
930214 (1) ·
930360 (1) ·
934126 (1) ·
934160 (1) ·
934161 (1) ·
940072 (1)
'.2mi East of US-27 ' (1) ·
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.25MI E OF US 1 ' (1) ·
'0.3MI E OF US-1 (SR-5) ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'Between SR-A1A & SR-5 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)