Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 CANAL ' (1) ·
'CR 702 45th Street ' (1) ·
'E-1 Canal ' (1) ·
'El Rio Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'Lake Ida Canal E-4 ' (1) ·
'Lateral Canal 30 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Northlake Blvd. ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 804 BOYNTON BCH BLVD ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'WPB Drainage Canal ' (1)
930015 (1) ·
930251 (1) ·
930294 (1) ·
930401 (1) ·
930413 (1) ·
930428 (1) ·
930455 (1) ·
930490 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
934213 (1) ·
934273 (1) ·
934327 (1) ·
934902 (1) ·
934924 (1) ·
940160 (1) ·
940161 (1)
'0.25 miles S/O SR 794 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'2.7 miles N of SR 806 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Between SR 710 and 786 ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'I-95 / SR 882 ' (1) ·
'Just E SR 7-Forest Hill ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
160500 (1) ·
173000 (1) ·
17500 (1) ·
1800 (1) ·
195661 (1) ·
203082 (1) ·
213000 (1) ·
226000 (1) ·
32500 (1) ·
34000 (1) ·
36794 (1) ·
39500 (1) ·
40000 (1) ·
45000 (1) ·
49000 (1) ·
57500 (1) ·
90900 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
157712 (1) ·
278468 (1) ·
300155 (1) ·
30363 (1) ·
3123 (1) ·
339472 (1) ·
352347 (1) ·
369555 (1) ·
392110 (1) ·
51387 (1) ·
58990 (1) ·
62283 (1) ·
68532 (1) ·
69400 (1) ·
78075 (1) ·
85015 (1) ·
99763 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)