Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'21ST ST SW ' (1) ·
'BRITT RD ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'DAVIS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'ORANGE TREE DR ' (1) ·
'PINETREE LANE ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'TROON DR ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700149 (1) ·
880044 (1) ·
884039 (1) ·
884047 (1) ·
894000 (1) ·
930499 (1) ·
930500 (1) ·
931006 (1) ·
935001 (1) ·
935002 (1) ·
936261 (1) ·
937201 (1)
'0.04MI S OF FOREST HILL ' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'1.5 miles South of SR 806' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'1Mi W of US-1 ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)