Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'CR-515 & Indian River ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'E-1 CANAL ' (1) ·
'EARMAN RIVER CANAL C-17 ' (1) ·
'FECRR ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'L.W.D.D. #9 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAPLE CREEK ' (1) ·
'RELIEF CANAL ' (1) ·
'Rowland Canal ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'SR 91 TPK ' (1) ·
'SR-401 ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'WILLOUGHBY CREEK ' (1) ·
I-95 (1) ·
INDIAN RIVER (1)
'BROWNS FARM/CR-827' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'DAVIS ROAD ' (1) ·
'Fountainhead Blvd.' (1) ·
'Fox Lake Rd. ' (1) ·
'HOLLY DRIVE ' (1) ·
'INLET CAY DR. ' (1) ·
'ISLAND DRIVE ' (1) ·
'MAC ARTHUR BLVD ' (1) ·
'MAPP RD ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SABLE ISLAND DRIVE' (1) ·
'SE ST LUCIE BLVD ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'Tomoka Farms Rd. ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'West Farms Road ' (1) ·
'Williams Road ' (1) ·
Grant Rd. (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
700015 (1) ·
700133 (1) ·
700140 (1) ·
700158 (1) ·
703001 (1) ·
703002 (1) ·
705603 (1) ·
790004 (1) ·
790087 (1) ·
790105 (1) ·
794063 (1) ·
890102 (1) ·
894033 (1) ·
894056 (1) ·
934518 (1) ·
934922 (1) ·
934923 (1) ·
934940 (1) ·
935506 (1) ·
936654 (1) ·
936655 (1) ·
937000 (1) ·
937002 (1) ·
937202 (1) ·
940050 (1)
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.04Mi W OF A1A ' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.1 MI S of LIGHTHOUSE DR' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.25 Mi. West of SR-405 ' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'1.0 Mile West of SR-710 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1/2MI S of INDIAN ST. ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'SR-528 EB - SR-401 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
'US-1 NB - FECRR ' (1) ·
'US-1 SB over FECRR ' (1) ·
1.3 Mi. East of CR-507 (1) ·
KENNEDY SPACE CENTER (1)
26212592 (1) ·
26212629 (1) ·
26281369 (1) ·
26295449 (1) ·
26315908 (1) ·
26320076 (1) ·
26322144 (1) ·
26382390 (1) ·
26490130 (1) ·
26492346 (1) ·
27011700 (1) ·
27080035 (1) ·
27101012 (1) ·
27222822 (1) ·
27552820 (1) ·
28070604 (1) ·
28240489 (1) ·
28241926 (1) ·
28313826 (1) ·
28313884 (1) ·
28350798 (1) ·
28493662 (1) ·
28493748 (1) ·
29024857 (1) ·
29090830 (1)
80024971 (1) ·
80025576 (1) ·
80033398 (1) ·
80051210 (1) ·
80053044 (1) ·
80054760 (1) ·
80075212 (1) ·
80121064 (1) ·
80121067 (1) ·
80121176 (1) ·
80161820 (1) ·
80230229 (1) ·
80285590 (1) ·
80293882 (1) ·
80360839 (1) ·
80375566 (1) ·
80401763 (1) ·
80444580 (1) ·
80454983 (1) ·
80510496 (1) ·
80511310 (1) ·
80511328 (1) ·
80575726 (1) ·
81045886 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)