Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BUCCANEER CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'E-1 CANAL ' (1) ·
'E-2-E Canal ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'L-8 CANAL ' (1) ·
'LAKE IDA CANAL ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Rose Bay Canal ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1)
'Atlantic Ave. ' (1) ·
'BOB W RD 130TH ST.' (1) ·
'Boynton Beach Blvd' (1) ·
'COUNTY LINE RD ' (1) ·
'DATE PALM RD ' (1) ·
'INLET CAY DR. ' (1) ·
'JOG ROAD ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'Main Street ' (1) ·
'MISSION HILL ROAD ' (1) ·
'OLD DIXIE HWY ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SR-76 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SW 22ND WAY ' (1) ·
'WEST LAKE DRIVE ' (1)
794122 (1) ·
890079 (1) ·
890127 (1) ·
894021 (1) ·
930032 (1) ·
930241 (1) ·
930463 (1) ·
930464 (1) ·
934116 (1) ·
934273 (1) ·
934488 (1) ·
934911 (1) ·
934927 (1) ·
935201 (1) ·
935202 (1) ·
935305 (1) ·
935306 (1) ·
936264 (1) ·
936654 (1)
'.25 mi East of I-95 ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'300' E of FL Turnpike ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'Boynton Bch Blvd at SR-7 ' (1) ·
'East of SR 7 on SR 806 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)