Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Citrus Blvd ' (1) ·
'Dairy Rd ' (1) ·
'Fox Lake Rd. ' (1) ·
'HOLLY DRIVE ' (1) ·
'Hull Road ' (1) ·
'IBIS WAY ' (1) ·
'INLET CAY DR. ' (1) ·
'MAC ARTHUR BLVD ' (1) ·
'MINUTE MAID RD 165' (1) ·
'N CENTRAL PARK BLV' (1) ·
'Old Dixie Highway ' (1) ·
'PARK COMMERCE BLVD' (1) ·
'PICOS RD 154.90 ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SABLE ISLAND DRIVE' (1) ·
'Tomoka Farms Rd. ' (1) ·
Grant Rd. (1) ·
Valkaria Road (1)
700129 (1) ·
700133 (1) ·
700135 (1) ·
700158 (1) ·
700159 (1) ·
790079 (1) ·
790084 (1) ·
790105 (1) ·
934922 (1) ·
934923 (1) ·
934940 (1) ·
936500 (1) ·
936654 (1) ·
936655 (1) ·
936801 (1) ·
937000 (1) ·
937002 (1) ·
940055 (1) ·
940059 (1)
'0.04Mi W OF A1A ' (1) ·
'0.1 MI S of LIGHTHOUSE DR' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.25 Mi. West of SR-405 ' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'1.16 MI S OF SR-68 ' (1) ·
'9.38 MI NORTH OF SR-68 ' (1) ·
'Citrus Blvd - I-95 ' (1) ·
'Dairy Rd - I-95 ' (1) ·
'Hull Road - I-95 ' (1) ·
'Old Dixie Hwy over I-95 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
1.3 Mi. East of CR-507 (1) ·
Valkaria Road and I-95 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.