Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR-5A ' (1) ·
'Crane Creek ' (1) ·
'Eau Gallie River ' (1) ·
'Eau-Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'Indian River IWW ' (1) ·
'Indian River Relief ' (1) ·
'Indian River Relief East' (1) ·
'SR-507 ' (1) ·
'Turkey Creek ' (1) ·
Horse Creek (1) ·
Indian River ICW (1) ·
Lake Washington Road (1)
700007 (1) ·
700008 (1) ·
700033 (1) ·
700043 (1) ·
700078 (1) ·
700156 (1) ·
700172 (1) ·
700174 (1) ·
700181 (1) ·
700184 (1) ·
700186 (1) ·
700191 (1) ·
700203 (1) ·
700206 (1)
'.5 Mi W of SR-507 ' (1) ·
'0.2 Miles East of US-1 ' (1) ·
'SR-404 WB-Indian River ' (1) ·
'SR-507 over Crane Creek ' (1) ·
'SR-518 over Eau-Gallie R.' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1 over Turkey Creek ' (1) ·
'US-1- Eau Gallie River ' (1) ·
'US-192 EB - Indian River ' (1) ·
'US-192 WB-Indian River ' (1) ·
I-95 NB and CR-5A (1) ·
I-95 SB -Lk Washington Rd (1) ·
SR-518 over Indian River (1) ·
US-1 over Horse Creek (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)