Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700210 (1) ·
700211 (1) ·
790004 (1) ·
790087 (1) ·
930029 (1) ·
930338 (1) ·
930458 (1) ·
930486 (1) ·
930487 (1) ·
930507 (1) ·
940096 (1)
'.2mi East of US-27 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'At East Canal St. ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'Just North of SR70 on I95' (1) ·
'SR-A1A - George King Blvd' (1) ·
'US-1 NB - FECRR ' (1) ·
'US-1 SB over FECRR ' (1) ·
SR-A1A SB- George King (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)