Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bulow Creek ' (1) ·
'Canal C-54 ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'F.E.C. Railroad ' (1) ·
'Goat Creek ' (1) ·
'Halifax Canal Lateral ' (1) ·
'Halifax River ' (1) ·
'Little Cow Creek ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'Reed Canal ' (1) ·
'Rose Bay Canal ' (1) ·
'Samsula Canal ' (1) ·
'Sebastian Canal ' (1) ·
'Spruce Creek ' (1) ·
'SR-9 (I-95) ' (1) ·
'Sykes Creek ' (1) ·
'Turnbull Creek ' (1)
'Babcock Street ' (1) ·
'Cow Creek Road ' (1) ·
'Fountainhead Blvd.' (1) ·
'Graham Road ' (1) ·
'Jackson Street ' (1) ·
'Jupiter Blvd. ' (1) ·
'Main Street ' (1) ·
'Orange Avenue ' (1) ·
'Pioneer Trail ' (1) ·
'Pioneer Trail ' (1) ·
'Richland Ave ' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'Samsula Drive ' (1) ·
'Saul Street ' (1) ·
'Sea Ray Drive ' (1) ·
'Sykes Creek Pkwy ' (1) ·
'Tadlock Ave. ' (1) ·
'Walter Boardman Ln' (1)
704011 (1) ·
704013 (1) ·
704042 (1) ·
704144 (1) ·
704150 (1) ·
704151 (1) ·
704154 (1) ·
704191 (1) ·
705603 (1) ·
705909 (1) ·
794117 (1) ·
794118 (1) ·
794120 (1) ·
794122 (1) ·
794126 (1) ·
794130 (1) ·
794184 (1) ·
796412 (1) ·
796518 (1) ·
940100 (1)
'.05 mi N of Indian Rvr Co' (1) ·
'.8 Mile North of SR-520 ' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.15 mi East of Bay Drive' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.25 mi N of Valkaria Rd ' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'At Reed Canal Road ' (1) ·
'Canal View Blvd Intrsectn' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)