Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Beach Blvd' (1) ·
'KIMBERLY BLVD. EB ' (1) ·
'KIMBERLY BLVD. WB ' (1) ·
'Lake Worth Road ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'PALOMINO DRIVE ' (1) ·
'PIONEER ROAD ' (1) ·
'SANDALFOOT BLVD EB' (1) ·
'SANDALFOOT BLVD WB' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SW THIRD ST ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
890082 (1) ·
930413 (1) ·
930464 (1) ·
934221 (1) ·
934328 (1) ·
934402 (1) ·
934404 (1) ·
934405 (1) ·
934428 (1) ·
934441 (1) ·
934468 (1) ·
934469 (1) ·
934904 (1) ·
934905 (1) ·
934927 (1)
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.8MI N OF LAKEWORTH BLVD' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At SR-7/US-441 ' (1) ·
'At US-441/SR-7 ' (1) ·
'Boynton Bch Blvd at SR-7 ' (1) ·
'Lake Worth Rd. at SR-7 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)