Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Banana River Relief ' (1) ·
'CANAL L-20 ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'Reed Canal ' (1) ·
'Relief E.of North Bridge' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'St. Johns River ' (1) ·
'Tomoka River ' (1)
700027 (1) ·
700028 (1) ·
700160 (1) ·
790027 (1) ·
790030 (1) ·
790053 (1) ·
796500 (1) ·
880053 (1) ·
880062 (1) ·
930142 (1) ·
935303 (1) ·
940046 (1) ·
940058 (1) ·
940082 (1)
'0.7MI W OF SR-401 ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.4MI E OF US-1 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'Babcock Street over I-95 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-46 - St. Johns River ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)