Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 Canal ' (1) ·
'CANAL E-2-E(BOYN BC INT)' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'Pine Street ' (1) ·
'Service Rd & Canal ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'SR-91 Fl. Tpk ' (1)
'EB 706 To SB I-95 ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-528 EB ' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 86.69 ' (1) ·
'SR91 NB TPK 86.88 ' (1) ·
'SR91 SB TPK 86.85 ' (1) ·
'SR91 SB TPK 87.213' (1)
700031 (1) ·
700117 (1) ·
700151 (1) ·
890111 (1) ·
890121 (1) ·
890122 (1) ·
930172 (1) ·
930239 (1) ·
930384 (1) ·
930416 (1) ·
930429 (1) ·
930430 (1) ·
930431 (1) ·
930432 (1) ·
930447 (1) ·
931001 (1)
'0.75 mile South of SR 708' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'Tpk. SR 706 Interchange ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10236 (1) ·
133595 (1) ·
136198 (1) ·
14921 (1) ·
16222 (1) ·
184778 (1) ·
185298 (1) ·
32965 (1) ·
5205 (1) ·
54946 (1) ·
61592 (1) ·
6940 (1) ·
82412 (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)