Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890048 (1) ·
890090 (1) ·
890106 (1) ·
890126 (1) ·
890127 (1) ·
890141 (1) ·
890142 (1) ·
890161 (1) ·
890162 (1) ·
930120 (1) ·
930121 (1) ·
930344 (1) ·
930362 (1) ·
930534 (1) ·
930535 (1) ·
930536 (1)
'.25 mi East of I-95 ' (1) ·
'.25mi W OF I-95 ' (1) ·
'.5mi W. of N. Lake Blvd. ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.5mi East of SR-786 ' (1) ·
'1.5mi East of Indiantown' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'5.8 Miles West of SR-76 ' (1) ·
'8.9 miles west of SR-76 ' (1) ·
'By Indian Grove Dr. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)