Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'Brando Canal ' (1) ·
'Callalisa Creek ' (1) ·
'City St. & Crane Creek ' (1) ·
'Conners Canal ' (1) ·
'Gabordy's Canal ' (1) ·
'Indian River EastRelief ' (1) ·
'Indian River Relief ' (1) ·
'IWW Indian River ' (1) ·
'Turnbull Creek ' (1) ·
'US-1 & FECRR ' (1) ·
'Yacht Club Cut ' (1)
700006 (1) ·
700233 (1) ·
700234 (1) ·
700235 (1) ·
790128 (1) ·
790149 (1) ·
790150 (1) ·
790151 (1) ·
790152 (1) ·
790172 (1) ·
794022 (1) ·
795700 (1) ·
795701 (1) ·
795713 (1)
'0.13mi NW from N Causeway' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-44 over US-1 ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-192 - Indian River Rel' (1) ·
'US-192 EB - Indian Riv ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)