Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CYPRESS WAY ' (1) ·
'I-95 (SR 9) ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'McClure Road ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'S. LAKE DRIVE ' (1) ·
'Spanish River Blvd' (1) ·
'SW 15TH AVE ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
930540 (1) ·
934420 (1) ·
934421 (1) ·
934461 (1) ·
934468 (1) ·
934469 (1) ·
934922 (1) ·
934923 (1) ·
934924 (1) ·
935204 (1) ·
935205 (1) ·
935206 (1) ·
935207 (1) ·
935222 (1) ·
935303 (1) ·
935507 (1) ·
936701 (1)
'0.1MI E of SW 9TH AVE ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.5Mi E of Military Trail' (1) ·
'1MI SW OF US-441 ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'PALMETTO PK RD US-441 SR7' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)