Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890048 (1) ·
890108 (1) ·
890109 (1) ·
890110 (1) ·
890114 (1) ·
890115 (1) ·
890116 (1) ·
890127 (1) ·
890128 (1) ·
890129 (1) ·
890159 (1) ·
894044 (1)
'.25 mi East of I-95 ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'2.5 miles North of SR-706' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'By Indian Grove Dr. ' (1) ·
'CR 76A over I-95 ' (1) ·
'NB I-95 / SR 714 ' (1) ·
'SB I-95 / SR-714 ' (1) ·
'South of St Lucie Canal ' (1) ·
'South of St. Lucie Canal ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)