Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
880050 (1) ·
880051 (1) ·
880052 (1) ·
880053 (1) ·
884019 (1) ·
884053 (1) ·
885602 (1) ·
885603 (1) ·
885604 (1) ·
885605 (1) ·
885811 (1) ·
885812 (1)
'0.1 Mile West of A1A ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'50FT. S OF 30TH STREET ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)