Drilldown: bridge data

From Indian River Lagoon Project
bridge data > County 003: Brevard & Owner 022: FDOT & Service On 042a: Other

Use the filters below to narrow your results.

ObjectID:
Status:
County 003: (Click arrow to add another value)
Direction 005e:
Features 006a:
Critical 006b:
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022: (Click arrow to add another value)
Built 027:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1) · 7 (1)
Traffic 029:
Traffic Year 030:
Service On 042a: (Click arrow to add another value)
Length 049:
Width 052:
Direction 102:
Scour 113:
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) · Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) · Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) · Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) · Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures (1) · Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures. (1) · Bridge not over waterway. (1) · Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 162 results in range #1 to #162.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

T


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)