Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'Boca Inlet ' (1) ·
'Boynton Inlet ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'ICWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Worth Lagoon ' (1) ·
'Lake Worth Relief ' (1) ·
'Little Lake Worth ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'Relief E.of North Bridge' (1) ·
'Tide Relief Canal ' (1)
930060 (1) ·
930061 (1) ·
930269 (1) ·
930361 (1) ·
930545 (1) ·
930546 (1) ·
930547 (1) ·
940003 (1) ·
940004 (1) ·
940045 (1) ·
940046 (1) ·
940084 (1) ·
940085 (1) ·
940094 (1) ·
940158 (1)
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.3 mi east of US 1 & PGA' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'A1A on Singer Island ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'South Causeway over ICWW ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-A1A East of ICWW ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)