Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal 29 (5 mile creek) ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 811 & FEC RR ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'SW 10th St. Lowson Blvd ' (1) ·
INDIAN RIVER (1)
'E/B S.R. 704 ' (1) ·
'EB SR 786 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'WB SR 786 ' (1) ·
'WB US 98 SR 80 ' (1) ·
NASA CAUSEWAY EB (1) ·
NASA CAUSEWAY WB (1)
703001 (1) ·
703002 (1) ·
930461 (1) ·
930462 (1) ·
930481 (1) ·
930491 (1) ·
930492 (1) ·
930493 (1) ·
930494 (1) ·
930501 (1) ·
930502 (1) ·
930507 (1) ·
930524 (1) ·
930525 (1) ·
930526 (1) ·
930527 (1) ·
930539 (1) ·
940152 (1)
'1 mi. east I-95 on SR 68 ' (1) ·
'1st overpass east of I-95' (1) ·
'2 miles west of Turnpike ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'E Congress Ave & S SR 806' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
KENNEDY SPACE CENTER (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
None (1) ·
10063 (1) ·
122864 (1) ·
125788 (1) ·
181308 (1) ·
22121 (1) ·
23422 (1) ·
27066 (1) ·
49014 (1) ·
66364 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)