Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Canal C16 ' (1) ·
'C-17 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'Creek ' (1) ·
'E-3 Canal ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Frazier Creek ' (1) ·
'Lake Ashby Canal ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'LATERAL CANAL D ' (1) ·
'MOORES CREEK ' (1) ·
'Pine Street ' (1) ·
'Rockledge Canal ' (1) ·
'SR-404 ' (1) ·
'Sykes Creek ' (1)
'45TH STREET ' (1) ·
'74TH AVE. ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'I-95 ' (1) ·
'IBIS WAY ' (1) ·
'NORTH 2ND STREET ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'Richland Ave ' (1) ·
'SR-40 ' (1) ·
'SR-415 ' (1) ·
'SR-5 (US-1) ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-808 Glades Road' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US1(SR5) ' (1)
700075 (1) ·
700087 (1) ·
700141 (1) ·
700151 (1) ·
700951 (1) ·
704013 (1) ·
790035 (1) ·
790049 (1) ·
884023 (1) ·
890002 (1) ·
930001 (1) ·
930265 (1) ·
930325 (1) ·
934100 (1) ·
934213 (1) ·
936801 (1) ·
945000 (1)
'0.1MI WEST OF A1A ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'1.15 Mi S of SR-520 ' (1) ·
'1.2 Mi. W of Barberville ' (1) ·
'AT 4TH STREET ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-5 S of Roosevelt BR ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 SB - SR-404 ' (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)