Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700017 (1) ·
700026 (1) ·
700027 (1) ·
700072 (1) ·
700110 (1) ·
700111 (1) ·
700113 (1) ·
700114 (1) ·
700146 (1) ·
700193 (1) ·
700194 (1) ·
700201 (1) ·
700208 (1) ·
700221 (1) ·
704011 (1) ·
704013 (1) ·
704016 (1) ·
704017 (1)
'.8 Mile North of SR-520 ' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'15ft. N of Pine Island Dr' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-404 EB-Banana Riv Rel ' (1) ·
'SR-520 - Banana River ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'SR-528 WB over SR-3 ' (1) ·
SR-46 over Six Mile Cr (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)