Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Babcock Street ' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'JEANNE AVE ' (1) ·
'JORGENSEN RD ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'MERCER AVE ' (1) ·
'SELVITZ RD. ' (1) ·
'SHINN RD (CR-609A)' (1) ·
'SR A1A ' (1) ·
'SR-528 ' (1) ·
'SR-528 WB ' (1) ·
'US98&441 SR700&15' (1) ·
I-95 (1)
700026 (1) ·
700113 (1) ·
700229 (1) ·
704042 (1) ·
884058 (1) ·
884060 (1) ·
930091 (1) ·
930546 (1) ·
937708 (1) ·
940027 (1) ·
940067 (1) ·
940070 (1) ·
945252 (1) ·
945253 (1) ·
945261 (1)
'0.2MI N OF NW BAYSHORE BL' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.3 mi east of US 1 & PGA' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'1.1 MILES NORTH OF SR-70 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'8 mi South of Malabar Rd ' (1) ·
I-95 over Addison Canal (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)