Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'BRANCH OF C-44 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CR-3 ' (1) ·
'CROOKED CREEK ' (1) ·
'George King Blvd ' (1) ·
'L-10 Canal ' (1) ·
'Little Haw Creek ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'Middle Haw Creek ' (1) ·
'SR-518 ' (1) ·
'SR-524 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'Summit Boulevard ' (1) ·
George King Blvd (1)
'CR603(JOHNSTON RD)' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'Levee Road ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-40 ' (1) ·
'SR-404 EB ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'ST LUCIE BLVD ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
SR-A1A SB (1)
700054 (1) ·
700122 (1) ·
700128 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
700941 (1) ·
790018 (1) ·
790920 (1) ·
890015 (1) ·
890126 (1) ·
894014 (1) ·
930291 (1) ·
930292 (1) ·
930805 (1) ·
934142 (1) ·
934499 (1) ·
934731 (1) ·
940041 (1) ·
940071 (1)
'.25mi W OF I-95 ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'300FT East of CR-717 ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'SR-40 - Little Haw Creek ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)