Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'CR-3 ' (1) ·
'Deep Creek ' (1) ·
'Drainage Canal ' (1) ·
'E-4 Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Over D Canal ' (1) ·
'Raulerson Canal ' (1) ·
'SR 91 TPK ' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'Turnbull Creek ' (1)
'CR708 125.4 ' (1) ·
'Haverhill Rd ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'JUPITER ISLAND PK ' (1) ·
'LE CHALET BLVD ' (1) ·
'Old Boynton Road ' (1) ·
'PINE RIDGE WAY ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'SR-700 ' (1) ·
'SR-76 ' (1) ·
'SUMMIT BLVD ' (1) ·
'Tangerine Drive ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-17 ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1)
700079 (1) ·
790002 (1) ·
790021 (1) ·
790086 (1) ·
790097 (1) ·
790149 (1) ·
790217 (1) ·
890119 (1) ·
890142 (1) ·
930451 (1) ·
930800 (1) ·
934126 (1) ·
934228 (1) ·
934295 (1) ·
934487 (1) ·
934981 (1) ·
935508 (1) ·
937714 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.1 MILE WEST OF I-95 ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'3 MI. east of SR-710 ' (1) ·
'3Mi. S of CR-717 ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR-404 WB over CR-3 ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
'US-1 SB - Turnbull Creek ' (1) ·
'US-17 over Deep Creek ' (1) ·
'US-92 EB -Tomoka River ' (1) ·
'US-92 WB-Tomoka River ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)