Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'HAVERHILL ROAD ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'PALMETTO PK RD ' (1) ·
'SR A1A ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'US98&441 SR700&15' (1) ·
'W. CAMINO REAL ' (1) ·
I-95 (1) ·
US-1 (1)
700206 (1) ·
700229 (1) ·
884058 (1) ·
884060 (1) ·
930091 (1) ·
934256 (1) ·
934406 (1) ·
934900 (1) ·
934901 (1) ·
934902 (1) ·
934918 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
940158 (1)
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
I-95 over Addison Canal (1) ·
US-1 over Horse Creek (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)