Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700080 (1) ·
700081 (1) ·
700082 (1) ·
700083 (1) ·
700146 (1) ·
700147 (1) ·
700148 (1) ·
700149 (1) ·
790174 (1) ·
790175 (1) ·
790201 (1) ·
930073 (1) ·
930338 (1) ·
930442 (1) ·
930443 (1) ·
937709 (1)
'.4mi. East of Congress ' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'At East Canal St. ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'SR-404 EB - Banana River ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 EB-Banana Riv Rel ' (1) ·
'SR-404 EB-Banana River ' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-404 WB-Banana River ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)